activity = 0.1 * Current Value - 0.2 * Unintended Consequences ~ ~ The Flow is the difference between the DESIRED VALUE and the Current Value. Note \ that this value may be negative which will mean that the flow reverses direction. | Current Value = INTEG(activity,5) ~ ~ Current Value begins with a value of 50 and is dependent on the rate of \ flow. | Unintended Consequences = DELAY3(Current Value,5) - 5 ~ ~ | ******************************************************** .Control ********************************************************~ Simulation Control Paramaters | FINAL TIME = 25 ~ Month ~ The final time for the simulation. | INITIAL TIME = 0 ~ Month ~ The initial time for the simulation. | SAVEPER = TIME STEP ~ Month ~ The frequency with which output is stored. | TIME STEP = 0.25 ~ Month ~ The time step for the simulation. | \\\---/// Sketch information - do not modify anything except names V300 Do not put anything below this section - it will be ignored *View 1 $0-0-0,0,Times New Roman|12||0-0-0|0-0-0|0-0-0|-1--1--1|-1--1--1|96,96,100 10,1,Current Value,240,86,40,20,3,3,0,0,0,0,0,0 12,2,48,71,86,10,8,0,3,0,0,-1,0,0,0 11,3,0,139,86,6,8,34,3,0,0,1,0,0,0 10,4,activity,139,102,23,11,32,3,0,0,0,0,0,0 12,5,4,191,131,16,16,0,0,0,0,-1,0,0,0 12,6,3,192,193,16,16,0,0,0,0,-1,0,0,0 10,7,Unintended Consequences,201,229,46,20,8,3,0,0,0,0,0,0 1,8,3,1,4,0,83,22,1,0,0,0-0-255,|0||0-0-0,1|(172,86)| 1,9,3,2,68,0,79,22,1,0,0,255-0-0,|0||0-0-0,1|(107,86)| 1,10,1,4,2,0,83,0,1,0,0,0-0-255,|0||0-0-0,1|(140,131)| 1,11,1,7,1,0,83,0,1,0,0,0-0-255,|0||0-0-0,1|(267,212)| 1,12,7,4,2,0,79,0,1,0,0,255-0-0,|0||0-0-0,1|(111,127)| ///---\\\ :L<%^E!@ 1:Current.vdf 9:Current 15:0,0,0,0,0,0 19:100,0 27:2, 4:Time 5:activity 24:0 25:25 26:25